MACROTESTG1

Advanced multifunction device for verification of electric safety of private and industrial electric systems (CEI 64-8 AND IEC/EN61557-1)

  • Earth resistance by voltammetric method with 2 or 3 spots in TT, TN and IT systems, overall earth resistance measurement and with clamp meter T2100 (optional).
  • Ground resistivity.
  • Measurement of electric parameters insingle- phase installations (V,A, W, VAR, VA, PF)
  • Measurement of continuity of protection conduc-

MacrotestG1 fully takes advantage of the touch-screen technology developed for MacrotestG3 and, hence, of all its settings, but its application range is for measuring earth resistance by voltammetric method, also with optional clamp T2100 and, finally, for continuity measurement of protective conductors. Cutting-edge management of measurement with indication, at the end of each safety test, of compliance or non-compliance with requirements with simple symbols OK o NOT OK.